Anchor VENUE SERIES - PROFILE SIZE: 160MM X 100MM User Manual

Browse online or download User Manual for Sports and recreation Anchor VENUE SERIES - PROFILE SIZE: 160MM X 100MM. Anchor VENUE SERIES - PROFILE SIZE: 160MM X 100MM User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - EMAIL: [email protected]

EC 4557 venue 1112PHONE: 812-867-2421FAX: 812-867-05471-800-544-4445EMAIL: [email protected]

Page 2

10Figure 1.2bTape measureMeasuring point for estimating width.6-hole base plate.6-hole base plate.6-hole base plate.Figure 1.2cRotate Measuring Rod ab

Page 3 - Safety Notes

Step 2: Assembling Arches2.1 Pre-assembly of arch components: Identify and layout all components according to Figure 2.1 for the entire structure.

Page 4 - 12 METER

12Rafter (Typ.)Rafter Extension (Typ.)Ridge Weldment (Typ.)Upright Assembly (Typ.)Swivel-Lock Pin (Typ.)Swivel-Lock Pin (Typ.)Note: Arches for (2) ba

Page 5 - 18 METER

2.3 Assembly of Cable Bracing: Install the cables so that the turn-buckles at the uprights are closest to the ground and at the roof cables are close

Page 6 - Installation Kit

Rafter (Typ.)Rafter Extension (Typ.)Ridge Weldment (Typ.)Upright Assembly (Typ.)Note: Arches for (1) bay shown.Diagonal Beam Brace (Typ.)Base Plate (

Page 7

Step 3: Erecting the Structure3.1 Preparation for Raising Arches: One advantage of the lightweight Venue structure is that only six experienced inst

Page 8 - Tent Width

Figure 3.2aFigure 3.2bFigure 3.2cDiagonal Beam BraceDiagonal Beam BraceDiagonal Beam BraceDiagonal Beam BraceDiagonal Beam BraceFigure 3.1aFigure 3.1b

Page 9

Figure 3.3aFigure 3.3bFigure 3.3c17Raising Second ArchSecuring Second ArchCompleting First BayPurlinsDiagonal Beam BraceEave/RidgePurlinEave/RidgePurl

Page 10 - Tent Front

3.4 Completing Installation of Upright and Roof Cable Bracing: Turnbuckles may need to be fully extended to attach cables. Refer to Figure 3.4 for

Page 11 - Step 2: Assembling Arches

193.5 Installing Gable End Framing: Refer to Venue Sizes and Configurations, pages 4 & 5, for layout of Gable End framing for various tent width

Page 12 - Step 2: Assembling Arches

 2 IndexIntroduction ... 3

Page 13

20Ridge WeldmentCenter UprightLocking L-PinSafety Latch BracketFigure 3.5aFigure 3.5bIntermediate UprightFigure 3.5cGable End Wing Eave PurlinRafterRa

Page 14 - Assembling Cable Bracing

21Figure 3.5dGable End Base Plate L-PinL-Pin with R-Clip properly seated.R-ClipEave PurlinGable End UprightLocking L-PinInsert WeldmentPurlin BracketG

Page 15

22Step 4: Installing Fabric Panels 4.1 Installing Mid Fabric Panels: Install Mid Fabric Panels first. Before installing, verify that all stakes ar

Page 16 - Layout of all Arches

4.2.3 Insert tension bars into tension pocket at bottom of gable end. Insert tension bar connector between tension bars and through tension strap lo

Page 17 - Completing First Bay

24Figure 4.2bMidGable EndTension StrapsCorner UprightTension Bars in Tension PocketsTension Bar Corner ConnectorsFigure 4.2aFigure 4.3aCorner UprightG

Page 18

Step 5: DismantlingFor the dismantling of the tent follow the installation instructions in reverse. The basics of dismantling: (All fabric panels

Page 19 - Quantity Description

Step 6: Routine Inspection and Maintenance6.1 Installation Period6.1.1 The entire tent structure system shall be inspected at regular intervals, but

Page 20

Step 7: SpecificationsClearspan Widths (meters): 9.0 / 10.0 / 12.0 / 15.0 / 18.0Ridge Heights (meters): 4.9 / 5.1 / 5.4 / 5.9 / 6.45Side Heights (m

Page 21

Anchor products are of superior design and operate best within the parameters of these instructions. It is imperative that the instructions be care

Page 22

IntroductionThe following instructions describe in a methodical manner the assembly and raising of the Anchor Venue frame tent.Please read all instruc

Page 23 - Now Tension all cables fully

3.0 m4.9 m4.5 m9 m3.0 m5.0 m5.0 m10 m4 .5 m5.0 m3.0 m5.4 m4.5 m12 m6.0 m3.0 m4.5 m9 METERVENUE SIZES AND CONFIGURATIONS9 METER 10 METER12 METER 12-9 M

Page 24

3.0 m5.9 m4.5 m12 m7.5 m3.0 m4.5 m15 METER15 METER3.0 m15-9 METER3.0 m4.5 m15-12 METER1.5 m6.0 m18 METER3.0 m6.5 m4.5 m18 m9.0 m4.5 m4.5 m18 METER4.5

Page 25 - Step 5: Dismantling

• Sledge Hammers/Stake Driver• Tape Measures• String Lines• Level• 1 1/8” Wrenches• Drop Cloths• Step Ladders (8’ and 12’ Recommended)• Chalk/Spray

Page 26 - 6.1 Installation Period

Step 1: Squaring Tent and Setting Base Plates 1.1 Squaring the Tent Layout: The area in which the tent is to be installed should be as level as poss

Page 27 - Step 7: Specifications

8Figure 1.1a2m2mABCTent LengthString LineTent FrontTent WidthTent LengthABCDE5m Arc4m Arc90ºTent Front3mFigure 1.1b

Page 28 - EVANSVILLE, INDIANA

91st Bay WidthAlign edge of Base Plate with String Line.Tent SideTent Width + 2mABCEString Line90ºFigure 1.1cTent Front6-hole6-holeMeasuring RodTent S

Comments to this Manuals

No comments