Quality, Craftsmanship and Service since 1892Please read all assembly / installation instructions before the installation or removal of this product.C
2PARTS LISTPARTSTENT SIZE10’ x 10’ 15’ x 15’ 5M x 5M 20’ x 20’BAG WITH TOP 1111TENSION STRAPS 4444UPRIGHT 4444EAVE, 10’ FEMALE 4 - - 4EAVE, 10’ MALE -
3Wall Hangs in Bottom Outside Channel.Century Frame Extrusion1ASSEMBLE EAVESMate 2 piece eaves if applicable. Join ends of eaves with corner weldment
4Place curtain web through triangle ring at end of tab as shown. Fasten upper hook of tension strap to curtain web. Insert lower hook into slot in u
5Raise opposite side by repeating Step 4.Attach remaining uprights.Plumb uprights.Firmly tension all guy webs before proceeding further.CAUTION: When
6Channel openingUprightAt each upright, gather up wall and insert bottom of beading (kedar) into channel opening at top of upright. Feed all of beadi
71. Remove Web Guys And Stakes.2. Loosen Tension Straps.3. Reverse Installation Steps.12TAKE DOWNDimensions are for Reference only. See Step 6A fo
Anchor products are of superior design and operate best within the parameters of these instructions. It is imperative that the instructions be care
Comments to this Manuals