Assembly InstructionsVehicle Maintenance ShelterSales Offices1100 Burch DrP O Box 3477Evansville, IN 47733Phone (812) 867-2421Fax (812) 867-0547 (800)
Figure 7a10Figure 7b Figure 7cVMS Standard Base FrameVMS - 8’ Extension KitVMS - 16’ Extension KitAligned Base PlatesAligned Base Plates
11Turnbuckles aretoward the Base Plates.STEP 8 - Attach X Cables.• Hook the cables into position as shown. Note the turnbuckles are at the bottom for
• Insert a ground bar into the pocket at the bottom of each side of the mid panel.• Hook J-Bolt through hole in vertical plate on base plate and lower
13STEP 10 - Pull second mid panel into place.• Proceed as with the first mid.Your Vehicle Maintenance Shelter is now ready for use.STEP 11 - Pull firs
14
NOTES:15
Anchor products are of superior design and operate best within the parameters of these instructions. It is imperative that the instructions be care
VMS (25’ x 32’) Parts ListItem No.Qty Part No. DescriptionPounds per Item Label1 2 80810 Left Lower Leg 25.8LLL2 2 80813 Left Upper Leg 18.6LUL3 2 8
VMS Frame Extensions Terminology8’-1 3/4” Extension16’ ExtensionStandard frame parts shown ghosted.Standard frame parts shown ghosted. 8’ Frame Extens
VMS Component Illustrations4
5VMS INSTALLATION SAFETY GUIDELINESPlease read through this assembly manual completely before beginning your installation. Be sure the proper equipme
STEP 2 - Top Frame Assembly• Lay out parts as shown. See Figure 2.• Peak weldments have yellow/orange color, eave weldments are silver/zinc colored.•
7STEP 3 - Add Upper Legs to one Side. See Figure 3.• Lay out the parts as shown. Three (3) upper legs and two (2) purlins.• The upper leg has angled
Right Leg w/ bolt and eyenut.Figure 5bMid Leg w/ eye-bolt and eyenut.Left Leg w/ bolt and eyenut.Figure 5b Parts ListITEMQtyDescription2423/8” x 2 3/4
9• Ensure sufficient personnel are on hand to lift the side (6 mini-mum, 5 lifting, 1 placing legs.)• Start lifting the side using the purlins at posi